14CFR vol2 part77 - 10 pages

Page 1 - pdf   html   txt
Section 73.81
14 CFR Ch. I (1-1-18 Edition)
(c) If it is determined that the information submitted under...
1958 (49 U.S.C. 1348 and 1354(a)))
1989; Amdt. 73-6, 58 FR 42001, Aug. 6, 1993;
73-8, 63 FR 16890, Apr. 7, 1998]
Section 73.85
73.99 are reserved for descriptions of designated prohibited...
PART 75 [RESERVED]
PART 77 - SAFE, EFFICIENT USE,
Subpart A - General
77.1 Purpose.
77.3 Definitions.
Subpart B - Notice Requirements
77.5
77.7
77.9
77.11 Supplemental notice requirements.
Subpart C - Standards for Determining Obstructions to Air Na...
77.13 Applicability.
77.15 Scope.
...
Page 2 - pdf   html   txt
Section 77.5
Subpart E - Petitions for Discretionary
77.37
77.39
77.41
40114, 44502, 44701, 44718, 46101-46102, 46104.
42303, July 21, 2010, unless otherwise noted.
Subpart A - General
Section 77.1 Purpose.
(a) The requirements to provide notice to the FAA of certain...
(b) The standards used to determine
(c) The process for aeronautical studies of obstructions to ...
(d) The process to petition the FAA
Section 77.3 Definitions.
14 CFR part 157.
12,500 pounds maximum gross weight
Subpart B - Notice Requirements
Section 77.5
(a) If you propose any construction
(b) If requested by the FAA, you
15:43 Jan 19, 2018
...
Page 3 - pdf   html   txt
Section 77.7
14 CFR Ch. I (1-1-18 Edition)
(c) Notice received by the FAA under
Section 77.7 Form and time of notice.
(a) If you are required to file notice
(b) You must submit this form at
(c) If you propose construction or alteration that is also s...
(d) If you propose construction or alteration to an existing...
(e) The 45-day advance notice requirement is waived if immed...
Section 77.9 Construction or alteration requiring notice.
(a) Any construction or alteration
(b) Any construction or alteration
3,200 ft. in actual length, excluding heliports.
10,000 ft. from the nearest point of the
3,200 ft. in actual length, excluding heliports.
5,000 ft. from the nearest point of the
(d) of this section.
(c) Any highway, railroad, or other
15:43 Jan 19, 2018
Page 4 - pdf   html   txt
Section 77.15
(d) Any construction or alteration on
(e) You do not need to file notice for
Section 77.11 Supplemental notice requirements.
(a) You must file supplemental notice with the FAA when:
(b) You must file supplemental notice on a prescribed FAA fo...
(c) If you abandon a construction or
(d) If the construction or alteration
Subpart C - Standards for Determining Obstructions to Air
Section 77.13
(a) Any object of natural growth, terrain, or permanent or t...
(b) The alteration of any permanent
Section 77.15
(a) This subpart describes standards
(b) Objects that are considered obstructions under the stand...
15:43 Jan 19, 2018
Page 5 - pdf   html   txt
Section 77.17
14 CFR Ch. I (1-1-18 Edition)
(c) The FAA will apply these standards with reference to an ...
(d) For airports having defined runways with specially prepa...
(e) The standards in this subpart
Section 77.17 Obstruction standards.
(a) An existing object, including a
(b) Except for traverse ways on or
15:43 Jan 19, 2018
Page 6 - pdf   html   txt
Section 77.19
Section 77.19 Civil airport imaginary surfaces.
(a) Horizontal surface. A horizontal
(b) Conical surface. A surface extending outward and upward ...
(c) Primary surface. A surface longitudinally centered on a ...
(i) 500 feet for visual runways having
(d) Approach surface. A surface longitudinally centered on t...
(i) 1,250 feet for that end of a utility
(v) 4,000 feet for that end of a nonprecision instrument run...
15:43 Jan 19, 2018
Page 7 - pdf   html   txt
Section 77.21
14 CFR Ch. I (1-1-18 Edition)
(i) 5,000 feet at a slope of 20 to 1 for
(e) Transitional surface. These surfaces extend outward and ...
5,000 feet measured horizontally from
Section 77.21 Department of Defense (DOD)
(a) Related to airport reference points.
30,000 feet.
(b) Related to runways. These surfaces
2,000-foot width may be reduced to the
200 feet beyond each end of the primary
Section 77.23 Heliport imaginary surfaces.
(a) Primary surface. The area of the
15:43 Jan 19, 2018
Page 8 - pdf   html   txt
Section 77.31
(b) Approach surface. The approach
(c) Transitional surfaces. These surfaces extend outward and...
Subpart D - Aeronautical Studies
Section 77.25 Applicability.
(a) This subpart applies to any aeronautical study of a prop...
(b) The purpose of an aeronautical
(c) The obstruction standards in subpart C of this part are ...
Section 77.27 Initiation of studies.
(a) Requested by the sponsor of any
(b) The FAA determines a study is
Section 77.29 Evaluating aeronautical effect.
(a) The FAA conducts an aeronautical study to determine the ...
(b) If you withdraw the proposed construction or alteration ...
Section 77.31
(a) The FAA will issue a determination stating whether the p...
(b) The FAA will make determinations based on the aeronautic...
15:43 Jan 19, 2018
Page 9 - pdf   html   txt
Section 77.33
14 CFR Ch. I (1-1-18 Edition)
(c) The FAA will issue a Determination of Hazard to Air Navi...
(d) A Determination of No Hazard to
(e) The FAA will issue a Determination of No Hazard to Air N...
Section 77.33 Effective period of determinations.
(a) The effective date of a determination not subject to dis...
(b) Unless extended, revised, or terminated, each Determinat...
(c) A Determination of Hazard to Air
21, 2010, as amended by Amdt. 77-13-A, 76 FR
2802, Jan. 18, 2011]
Section 77.35 Extensions, terminations, revisions and correc...
(a) You may petition the FAA official
15 days before the expiration date of
(b) A Determination of No Hazard to
(c) A Determination of No Hazard to
15:43 Jan 19, 2018
Page 10 - pdf   html   txt
Section 77.41
Subpart E - Petitions for
Section 77.37 General.
(a) If you are the sponsor, provided a
(b) You may not file a petition for
Section 77.39 Contents of a petition.
(a) You must file a petition for discretionary review in wri...
Section 77.35.
(b) The petition must contain a full
(c) In the event that the last day of
(d) The FAA will inform the petitioner or sponsor (if other ...
Section 77.41
(a) If discretionary review is granted,
(b) If discretionary review is denied,
(c) After concluding the discretionary review process, the F...
15:43 Jan 19, 2018