620
14 CFR Ch. I (1–1–24 Edition)
§ 65.92
(c) To be eligible for an inspection
authorization, an applicant must—
(1) Hold a currently effective me-
chanic certificate with both an air-
frame rating and a powerplant rating,
each of which is currently effective and
has been in effect for a total of at least
3 years;
(2) Have been actively engaged, for at
least the 2-year period before the date
he applies, in maintaining aircraft cer-
tificated and maintained in accordance
with this chapter;
(3) Have a fixed base of operations at
which he may be located in person or
by telephone during a normal working
week but it need not be the place where
he will exercise his inspection author-
ity;
(4) Have available to him the equip-
ment, facilities, and inspection data
necessary to properly inspect air-
frames, powerplants, propellers, or any
related part or appliance; and
(5) Pass a written test on his ability
to inspect according to safety stand-
ards for returning aircraft to service
after major repairs and major alter-
ations and annual and progressive in-
spections performed under part 43 of
this chapter.
An applicant who fails the test pre-
scribed in paragraph (c)(5) of this sec-
tion may not apply for retesting until
at least 90 days after the date he failed
the test.
[Doc. No. 1179, 27 FR 7973, Aug. 10, 1962, as
amended by Amdt. 65–5, 31 FR 3337, Mar. 3,
1966; Amdt. 65–22, 42 FR 46279, Sept. 15, 1977;
Amdt. 65–30, 50 FR 15700, Apr. 19, 1985]
§ 65.92
Inspection authorization: Dura-
tion.
(a) Each inspection authorization ex-
pires on March 31 of each odd-num-
bered year. However, the holder may
exercise the privileges of that author-
ization only while he holds a currently
effective mechanic certificate with
both a currently effective airframe rat-
ing and a currently effective power-
plant rating.
(b) An inspection authorization
ceases to be effective whenever any of
the following occurs:
(1) The authorization is surrendered,
suspended, or revoked.
(2) The holder no longer has a fixed
base of operation.
(3) The holder no longer has the
equipment, facilities, and inspection
data required by § 65.91(c) (3) and (4) for
issuance of his authorization.
(c) The holder of an inspection au-
thorization that is suspended or re-
voked shall, upon the Administrator’s
request, return it to the Adminis-
trator.
[Doc. No. 12537, 42 FR 46279, Sept. 15, 1977, as
amended by Amdt. 65–50, 72 FR 4404, Jan. 30,
2007]
§ 65.93
Inspection authorization: Re-
newal.
(a) To be eligible for renewal of an in-
spection authorization for a 2-year pe-
riod an applicant must present evi-
dence during the month of March of
each odd-numbered year, at the respon-
sible Flight Standards office, that the
applicant still meets the requirements
of § 65.91(c) (1) through (4). In addition,
during the time the applicant held the
inspection authorization, the applicant
must show completion of one of the ac-
tivities in § 65.93(a) (1) through (5)
below by March 31 of the first year of
the 2-year inspection authorization pe-
riod, and completion of one of the five
activities during the second year of the
2-year period:
(1) Performed at least one annual in-
spection for each 90 days that the ap-
plicant held the current authority; or
(2) Performed at least two major re-
pairs or major alterations for each 90
days that the applicant held the cur-
rent authority; or
(3) Performed or supervised and ap-
proved at least one progressive inspec-
tion in accordance with standards pre-
scribed by the Administrator; or
(4) Attended and successfully com-
pleted a refresher course, acceptable to
the Administrator, of not less than 8
hours of instruction; or
(5) Passed an oral test by an FAA in-
spector to determine that the appli-
cant’s knowledge of applicable regula-
tions and standards is current.
(b) The holder of an inspection au-
thorization that has been in effect:
(1) for less than 90 days before the ex-
piration date need not comply with
paragraphs (a)(1) through (5) of this
section.
(2) for less than 90 days before March
31 of an even-numbered year need not
VerDate Sep<11>2014
14:00 Mar 14, 2024
Jkt 262047
PO 00000
Frm 00630
Fmt 8010
Sfmt 8002
Q:\14\14V2.TXT
PC31
aworley on LAPBH6H6L3 with DISTILLER